LCD Greenland 2 House 2.8. Developer "SETL CITY": opinion of people

LCD "GREENDAND 2"- A new object from the developer SETL City is built in close proximity to St. Petersburg - Muorino settlement.

Apartments and planning

LCD "Greenland 2" is a part of a large-scale building in Murino village. The complex will consist of 14 houses and your own infrastructure facilities. The planning of apartments in Greenland 2 LCD is not too diverse: you can buy a studio or an apartment with one or two rooms.

All rooms will be handed over with finishing.
Prices for apartments in the complex are quite acceptable, given the country's own infrastructure and renting apartments with finishing.

Developer "SETL CITY": opinion of people

Seattle City is one of the largest developers working in St. Petersburg. It is distinguished by observing the timing of the delivery of objects, and sometimes the course of construction finishes even earlier than the outlined period. The company has already many erected objects of different class in several areas of St. Petersburg and region, which, of course, talks about it, as a responsible and proven developer.

Transport accessibility and address

Greenland 2 LCD is located in Murino - one of the fastest wise areas of the region. The metro station and the railway station "Devyatikino" are 3 km from the facility. Nearby there is an interchange of the CAD and several large shopping centers: "Mega-Parnas", "Rodeo Drive", "K-Raut". Social infrastructure facilities in the area are not so much, but the developer plans to increase their number.

A total of 1958 apartments were offered to customers, most of whom are studio apartments, there are also one-bedroom rooms. The area varies from 23 to 84 sq.m. with kitchens up to 20 sq.m. All apartments will give up with finishing offered in a bright or dark color scheme - to choose from.

The first floors of buildings will be with commercial real estate. In addition, in one of the buildings there is a built-in-attached parking, and in the other - a kindergarten.

  • Infrastructure

    In the territory of the LCD "Greenlanda 2", the developer besides 14 residential buildings plans:

    • four kindergarten;
    • clinic;
    • sports complex;
    • gaming and children's zones;
    • five indoor parking.

    Judging by the number of apartments and distance from the subway station, it can be assumed that such a number of parking spaces will be clearly not enough, almost two thousand apartments and only 48 seats on the covered parking lot. It is worth noting that it is also assumed to have open guest parking lots.

  • Transport accessibility of residential complex

    The complex is located near the Murrian junction of the ring road. The nearest metro station is ninekino and railway platforms distance about two kilometers. Approximately the same distance to the nearest major trading complexes and hypermarkets.

  • Ecology of the district of Novostroy

    From an ecological point of view, the area cannot be called favorable for living due to the proximity of the CAD. At the same time, within walking distance of LCD "Greenland 2" flows the stream of the hut and is not a very large forest array.

  • Payment options

    The developer offers when buying a housing to take advantage of mortgage lending in one of the partner banks: VTB24, Bank "St. Petersburg", Sberbank, Raiffeisen Bank, Globeks, Opening Bank, Ak Bars and Tatfondbank. For more information, you can contact the official site "SETL CITY" and LCD "GREENDAND 2".

  • LCD Greenlandia 2. Official webcams from construction site

    You can observe the construction of the new LCD "Greenlanda 2" from Seattle City online, from official webcams at the construction site of the residential complex. Cases 2.9, 2.10, 2.11 ,.

    All Cases: | | |

    Webcam LCD GREENDAND 2 - Case 2.9

    Official webcam around the clock broadcasts the construction of the building 2.9 Greenland 2 LCD.

    Webcam LCD GREENDAND 2 - Corpus 2.10

    The webcam round the clock broadcasts the construction of the building No. 10 LCD Greenlanda 2.

    Webcam LCD GREENDAND 2 - Case 2.11

    Video surveillance for building hull No. 10 LCD Greenlandia 2.

    »»

    Information about LCD "Greenlanda 2"

    After the deafening success of the first stage of the Greenland LCD in Murino, the developer SETL CITY has begun to implement the second stage of this large-scale project. The residential complex will be located just a 20-minute walk from the Metro station "Devyatikino" (along the shortest way), in a rapidly growing and actively landscaped area "Western Murino".

    Not far from the LCD "Greenland" there is a lot of major shopping centers (for example, mega and IKEA) and airless suburbs with a beautiful nature and a multitude of picturesque lakes surrounded by pine forests. You can get there both by car and by train departing from the same station "Devyatikino" as the subway.

    Accurate location of Greenland 2 LCD on an interactive area of \u200b\u200bthe area:

    The cost of apartments

    The cost of apartments in Greenland 2 remains at one of the most affordable levels for housing sites near the metro.

    Comfortable studio - from 1 950 079 (the minimum area is 23 square meters. Meters), one-room Apartments - from 2 600 175, two-room and eurodowushki - from 4 050 093, three-nate - from 5 750 034. But hurry, such favorable offers are available only in the early stages of construction!

    Clarify current prices for apartments and current special offers by telephone sales department SETL CITY.

    The term of delivery of the last housing of LCD "Greenland 2" is scheduled for II. 2019

    History of construction of a residential complex Greenlandia from Seatlesiti

    SETL CITY performs facade work in the building 2.8 LCD Greenland 2
    The SETL City developer performs work on the facades and the roof of the housing 2.8 LCD GREENDAND-2 near the metro station "Devyatikino". Specialists glazed balconies, mount windows, doors, electrical networks, heating and water supply systems, set modern silent elevators.

    SETL CITY for half a year earlier passed three housings LCD GREENDAND-2
    SETL City put into operation 2.5 - 2.7 LCD GREENDAND-2 with underground parking for half a year before the alleged time of delivery. As part of a residential complex, a built-in and attached kindergarten, calculated on 100 kids, was also erected.

    Dimatic

    2019-05-22

    Yes, the weak complex, as for Seatla. And transport accessibility is lame, a lot of odds, and the number of apartments on the floor is also finally tin. Parking is small, but I look, most complexes have such a problem. Green zones here are also a bit, there is no place for a walk. In general, personally does not indispose this project.



    Reply


    Olga

    2018-12-26

    http://spbguru.ru.


    About elevators - this is generally a whole song! In fact, except to be out on the developer, for such elevators, I don't want anything else! I live in the building 2.4 for a year and for this year we were no rest! Initially, these elevators were annoyed by their slowness, so they still break down constantly! It was necessary to guess to put 2 elevators in the entrance with 17 floors, and on each floor of 16 apartments, and that another of these elevators was constantly broken! Well, if you put just two elevators on such a big entrance, then these elevators must be very good quality, and on these elevators immediately seen their "quality", because they break from the moment of delivery of the house! And now what is the situation: most often broken a cargo elevator, respectively, you can imagine what a picture will wrap at 7 pm, when everyone comes from work and cannot get to their stages, because a small elevator transports 4 people and makes it super-slow ! The dispatcher is calling, and she already hung over the year to take these calls, and says that the elevator will not change! Repair also does not give any effect, because after repair, this elevator can break the next day, and you call the dispatcher again and you answer you: "How, again I broke?!". In general, if I knew initially that the developer would "try", then there would be somewhere else in the other place of the apartment! Was the other day in their LCD "Clean Sky" - there they are somehow adequate elevators inserted, and then what is the "gift"?! And now this problem is not needed, the developer did its business, the dispatcher does not end the repairmen, which can not help too, and people who live above 10 floors are having fun, especially moms with wheelchairs are having fun! Many thanks to our dignified developer! In general, I advise everyone or not to take apartments above 5 floors in this LCD, or if you took an apartment above, hope and pray that you are lucky more than the 2.4 corpus!



    Reply


    Alexander

    2018-07-14

    http://spbguru.ru.


    I live in this LCD since January 2018, I share experienced (theses): What do you like: + Reliable developer (built ahead of time, the settlement happened, respectively, before); + acceptable apartments price; + ceilings 2700mm; + to the subway on foot 20 minutes + Criminal Normal guys make their work. + electric heated towel rails. This is what I understand - the 21st century. + Houses are warm (he lived with turns off radiators), in the entrance he fries like in the bath. What's not like: - hearingness. I hear the neighbors regularly. There would be money for repairs - before the settlement it would be watched by the "Shumkov" all the apartment; - Balcony glazing. Yes, everything is beautiful. Spacious balconies. But they flow from rain. Neighbors from the 17th floor of the headlight is generally globally. I have on the 10th floor - small puddles. Called under warranty (guys came from the contractor, if I am not mistaken by the name "Avangard" - engaged in these glazing) - came, did something, but eventually cumshot balcony even more. - Elevators. I would call this LCD - Greenland 2 elevat. I do not understand how you can design so that at 10+ apartments on the floor can I install 2 elevators? What are these issues? And here, on the guru, the class of housing is a comfort class. Yeah, the best comfort with 2 elevators. Elevators are slow (this is now about the first place (4 houses)), while you go from 10 to 1 you feel how old. Well, naturally elevators are often broken (especially freight). I do not argue that the elevator breaks because of the neighboring-village, but damn what is the difference if the 1st floor is going to a small elevator for 4 people? - Neighbors. Of course, this developer is not to blame, but be prepared that your neighbors will shit where they live. And shit very much. - Storeroom. Storerooms flow as balconies. - The hole near the house at Shuvalov 23. The meaning of the hole in the roadbed. The Criminal Code does not care about it, the developer does not care (although it seems like he built this section of the road) - very small underground parkings. Although who right now builds them big? - Entrance groups. Very small, mailboxes for mail are made on the fire ladder (it is necessary to go to another door). - Studio glass partitions. Strkutut of the house such that 4 studios go in a row - and balconies, respectively, they have a "jack in the joint." And this junction is a glass partition. Hi neighbor in short. --- Now that it is written here on the guru: 1. There are no schools, the children's gardens are closed, the sports center is not open, there are no polyclinics, there are covered parking lots. Radiators without thermostators. We buy themselves. 3. PR transport accessibility is silent - about it and so everyone knows, there is not an developer to blame .--- "Greenland 2 elevator", although it is a continuation of the project, but the houses of the first to give Greenland 1 is much better (in terms of quality). But the yards of Grini 2, as for me, so much more cozy.



    Reply


    resident of

    2018-01-08

    it is very strange that the developer changes the project of houses on the go. A garbage disposal was specified in the PD, and it does not appear. Plus, mailboxes on the black staircase are, a very small elevator hall compared to Greenlanda 1.



    SETL City. Do not represent. The company has a higher score "A +" in the ranking of St. Petersburg developers, has already built a huge number of houses and with the project "Greenland 2" Changes confidently. During the construction, some deviations from the terms of delivery arose, but this did not prevent experts to include a residential complex in a white list of new buildings, as a very reliable project.

    Currently, three buildings are currently handed over in the third quarter of this year (2.9, 2.10 and 2.11), approach to an end. The finishing finish of apartments is completed. It is unlikely that something will prevent the developer to pass these houses until the end of the quarter. Cases 2.12 and 2.13 promise to put into operation before the end of the year and there are also no special doubts about this. House 2.12 externally looks completely ready, in its internal work is underway. In the building 2.13, builders are completed by facades and roofs and are also engaged in internal work in the house. Thus, in the current year, most likely, the LCD will be fully commissioned.

    In the opinions of the portal over the years, we have already told about all the strengths and weaknesses of this residential complex. It is known two of their problems, the solution of which is paid to a lot of attention: traffic jams and a shortage of social infrastructure. Note that "sociable" is developing little. So, on September 2, two new kindergartens were opened on the County Street, built by Setl City in the project frame. There are advances and transport infrastructure. Started construction of the cad junction in the target of Shuvalov Street. The authorities promise that she should enter at the end of 2020. This will significantly improve the transport accessibility of Western Murino for car owners. For Novoselov "Greenland 2" departure to a new junction will be very convenient - straight from their homes on the street. Shuvalova.

    According to Murino, the cost of a square meter in Greenland 2 is not the lowest. However, the reliability of the developer plays a project to the hand. No wonder the LCD is among the top five in the ranking of Novostroeks Ninekino. The demand for apartments in Greenland 2 is stable, even despite high competition. In eight hand-commissioned buildings, almost all apartments have already been sold. The last four options remain from the developer and as much as the assignment. In those houses that the choice for rent this year is slightly wider, but also not too wide - less than flexible recent apartments, and some of them are also offered by concession.

    In the western part Murino has a huge number of new buildings, so there is a choice. Approximately on the same distance from the subway as "Greenland 2" or even closer, there are a number of new buildings, in which apartments or studios can be selected at a lower price. Among such options, the LCD "Paints of Summer" from (Rating of the developer "A"), LCD Mulino Park and LCD "Murrian heights" (Rating "B +"), LCK "Lampo" (Rating "B-") and LCD " Constellation "from (" C- "rating), as well as the LCD" Forward "(Rating" B "). Attractive at prices residential complexes "Vitamin", "Territory" and "Three Whale" (Rating "B"), but the deadlines for all three projects are postponed.

    Opinion, August 2018 August 17, 2018

    Not the cheapest from Murrin projects, but it is reliable. Reputation SETL City. Doubt do not have to. The company received the maximum assessment of "A +" in experts. It is among the largest participants in the construction market of the Northern Capital. Cable buildings LCD "GREENDAND 2" already commissioned. Corps 2.8, which should be commissioned in the first quarter of next year, in the middle of August already built, in its internal work. Externally, the building looks ready, and even the improvement of the territory adjacent to it is almost completed. So the passage does not cause doubt. Three more buildings: 2.9, 2.10 and 2.11, to pass which is supposed to be in the second quarter of 2019, are still under construction. All three houses were erected, work on the stone masonry of walls and glazing windows completed, but it takes to finish the facade and internal works. The time remaining to delivery is quite enough to fulfill all the necessary work. In parallel, the construction of buildings 2.12 and 2.13 continues. The monolithic frame of the first of them is Doros until the tenth floor, and the housing 2.13 - to the level of the fifth. Work is carried out actively, and considering that in reserve the developer has almost a hundred and a half years, the positive result of their doubt causes.

    The strengths and weaknesses of the second "Greenland" are discussed in detail in the previous opinions of our portal. To the one we can add that over the past year, the list of social bodies of Western was replenished. The Murinsky Center for Education No. 2, built by Setl City, entered the construction of SETL City within. 1175 children will be able to go to this school. The number of kindergartens increases. As part of the first "Greenland", four kindergartens are open. In addition, there are also rooms under two kindergarten for one hundred places each place in hand-held buildings "Greenland 2". In the near future, they will start working. Plus, next year, two more kindergartens will appear here, the premises are reserved in the Corses 2.11 and 2.13. As for the construction of a school in "Greenland 2", then the developer has not yet searched - an object at the design stage.

    The most important for the inhabitants of the Western Murina an event was the discovery last year movement under the CAD from the Okhtin Alley to the upper street. Due to this, the departure from the bugrov unloaded and the tensions on the roads in the peak hours decreased. Significant austerity in anticipation of construction in Murino is another cadu.

    "Greenland 2" is one of the best projects in. Sales here, despite the sharp competition, go well. In seven already surrendered corps today about a dozen options are available. In houses under construction, the choice is also not wide: a little more than 80 apartments for six houses is, this is a very small percentage of the total number of offers in the LCD.

    New buildings in the western part Murino are very much, competition is high. Among the nearest residential complexes as an alternative, it is possible to consider from, ("B"), from (B + rating), ("B +" rating), and from (B- "rating). Also, in the neighborhood there are a number of new buildings, the deadlines for which they are moved to: Companies "Petrostra", from (rating "A"), ("B-" rating), from (rating "C"), etc.

    Opinion, May 2017 May 12, 2017

    There are such developers who are practically nothing to criticize. "SETL CITY" Just from their number. Wherever the company fell for the construction, you can be sure that everything will be built qualitatively and long-term fear is not necessary. Yes, in difficult crisis times there are small delays in terms of certain objects from the developer. But all this working moments, and in any case, long to wait for their apartments to shareholders. Therefore, the highest score "A +", which experts put "SETL CITY" in St. Petersburg and the Leningrad region.

    The course of construction of the LCD "Greenland 2" Once again confirms the high renome of the developer. At the end of this year, four corps of the first stage are handed over (№1-4), and I must say that there is no doubt about their timely commissioning. All of them are already now, as of May 2017, are in the high stage of readiness. Only in the first corps still left to complete roofing and mounted stained steel structures. And in the rest of all four buildings, internal works are underway, installation of engineering systems, decoration of apartments and common areas, on the agenda, the improvement of the country areas.

    As for the buildings 5, 6 and 7, the delivery is scheduled for the second quarter of 2018, then the construction of them is also advanced in a rapid pace. The monolithic work in the houses are completed, there is a laying of external walls and internal partitions, glass windows are mounted, the insulation of facades continues, the builders are engaged in the installation of engineering systems in homes. Given that there is still a whole year ahead, the fate of these three buildings of the second queue also does not cause any questions.

    All with regard to the advantages and minuses of this residential complex, are highlighted in detail by us in an earlier view of the portal. It should be noted that although the development of the Western should not stand still, however, residential buildings, as usual, grow and populate faster, rather than the objects of social infrastructure are being built. And if, schools and kindergartens in Western Murino appear (here and the kindergarten of 2 "Greenland 2" has already been built, builders are now engaged in its draft finish, as well as a summary of engineering communications), then with medical objects the situation is still very Tense. Local ambulatory and hospitals are not nearby, walking to them go far, and ride in transport - long (including traffic jams). In addition, health care facilities are overloaded and not always to get medical care in them and not always. In the summer of this year, the authorities promise to open a medical point in Western Murino and the post of ambulance, which will allow at least partially to improve the state of affairs. However, before the promised polyclinic will be built here, the situation will not dramatically improve.

    It does not have a quick solution and the problem of traffic jams when leaving Western Murino through the hillocks. In the near future, the authorities promise to build a transport junction with a separate exit on the CAD, but this is not one year. In the meantime, the inhabitants hope that the passage under the ring will be breaking through, so that the car enthusiasts Mulino appeared another corridor to leaving to St. Petersburg. Judging by the reports of a number of media, it may be done in 2018.

    Sales in the LCD "Greenland 2" go very dynamically. In the middle of May, in four houses of the first stage, there was only a little more than a hundred apartments on sale, while apartments in the third building were practically sold. In three houses, the second stage is currently available about 280 options, which is also generally a bit. This indicator inspires respect, especially if we take into account the crucial competition that exists in Western Murino. The choice of new buildings is very wide here. Literally next to Greenlande 2 ("B"), it is true here there is a transfer of deadlines. Here there are two new buildings from ("B" rating): and "Alphabet" (the transfer of deadlines is also marked). Two more residential complex builds (B + rating) -

    Externally at home in a new complex - flesh from blood. The same brick-monolithic multi-storey high-rise buildings, decorated in pastel colors and surrounded by a large number of green plantings. Note the truth that all apartments will give up in a new part of the project with full finishing, while in the first two quarters and options without finishing were presented.

    As in the first "Greenland", in the LCD "GREENDAND 2" is planned its own infrastructure. Built-in kindergarten 100 seats will be delivered along with the first four buildings at the end of 2017. Also within the first stage, it is planned to put into operation a built-in-attached parking, however, it will contain only 48 cars. In general, the infrastructure of the quarter will include a large number of objects, with a variety of, in addition to schools and kindergartens, this is still a polyclinic (we recall that in this location with medical institutions a big problem), a physical well-being center, a library. We will not forget that the first two quarters of "Greenland" are actively developing, in which three kindergartens already surrendered and the construction of the school is. Another school is east of about 300 meters from the borders of GREENDAND 2.

    Until the end of 2016, the construction of the continuation of civil prospectus should begin, work will also begin work on the creation of civilian civil society with CAD. In a remote run - the extension of Svetlana Prospectus for the CAD. All this should seriously improve transport accessibility. In the meantime, the location transport problems are not simply relevant, but also felt all the sharper.

    The construction of the first stage of the LCD "Greenland 2" is actively. In the fourth building, work goes at the level of the fourth floor, in the first - fifth, in the second - the eighth, in the third - the eleventh. Recall that all the houses for the first two quarters of the LCD GREENDAND were introduced on time, and some even ahead of schedule. The excellent reputation in the company SETL CITY, allowing it to remain one of the leaders of the Petersburg construction market, is partly due to the punctuality of the developer.

    As in the first part of the project, in the second most attention is paid to studios and one-bedroom apartment. Square in residential premises are small, but not very tiny options. At the same time, residential rooms in all apartments are spacious, and the savings are carried out mainly due to small kitchens. Almost all apartments provide balconies or loggias.

    gastroguru 2017.